04-09-2009, 06:49 PM
The update to TimeBillingWindow works better. The total times report works right. But the projects and tasks reports don't. They return the same data for the 2 dates I put in. The task report could use a Total line for each project, too.

Thanks.

Paul Mayer
04-13-2009, 03:19 PM
We redesigned the Totals report and took the other two reports out since there is no actual time data stored in those areas. You can now select the project to report on as well as date and time filtering.

Garrett
09-28-2009, 03:18 PM
I'm aware of how filtering works. I need to create a daily report of time spent on multiple projects and tasks. I do not see where this app allows me to do that. If it does, please advise. Thanks for your help.

Paul Mayer
09-28-2009, 03:49 PM
You can select the date to use and the project to report on. An Example is to check the Date and Time limit and select a single date. And Check the Selected Project check box and select the project to report for that date.

See the attached screen shot.

Garrett
09-28-2009, 09:29 PM
I observed your screenshot of the reports window. Hopefully you are able to view my uploaded attachment of the my reports window. I do not show the options to view total time by date or by project. I simply have a window which allows me to either preview or print a report. I'm using version 1.0.3 which I believe to be current, but i'm checking again for updates.

Garrett
09-28-2009, 09:36 PM
There was an update available. The update feature simple does not work within the app itself. I manually downloaded the product, thus the new features should be available.

Paul Mayer
09-28-2009, 09:37 PM
Yes, we are on version 1.0.11 so you missed 8 updates we had so far.

Look at this page to see the new features and changes made to the software:

http://zpay.com/vbulletin/forumdisplay.php?f=21